A 15m high tower, 8m x 8m base with five floor levels was fabricated and installed to the existing plant. All the process machinery was installed. Extraction system ducting designed, supplied and installed.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed